Assignment 1 sesi Dis 2018 DCC 1023
Assignment 1
TASK
This assignment need to organize in groups (3- 4
person). Each group is required to go to the real site construction and get the
picture based on the guidance provided. The
purpose of this assignment is to collect information about:
a.
Find any failure in concrete construction in PSMZA
campus area and define all of those failures about :
i.
Type of construction or structure
ii.
What are the causes of the failure
iii.
How to prevent all the failure
b.
If you are as the contractor that’s respond to
repair those failure, what is your
suggestion how to fix those problems?
BM
a. Cari dan kesan sebarang kecacatan dan kegagalan dalam kerja-kerja konkrit disekitar kampus PSMZA dan tentukan perkara berikut:
i. Jenis struktur atau binaan
ii. Punca kegagalan
iii. Langkah mengelakkan kegagalan itu daripada berlaku
b. Sekiranya anda seorang kontraktor yang bertanggungjawab membaiki kegagalan tersebut, sila cadangkan cara-cara membaiki kerosakan tersebut.
Comments